Font Size:
The Prime Minister, Dr. Abiy Ahmed Inaugurated A Gold Factory With A Capacity Of 4,386 KG Per Annum.
The Tulluu Kapi Gold Mining Factory is operating with a capital of US$ 300 million and 30 million.The factory has a capacity of 4,386 kg of gold annually.

